Daily reports

A daily report is built from the day's confirmed site updates. Its numbers come from the BOQ; the AI only writes the summary. The site engineer or project manager drafts it, and the owner or project manager issues it.

Yumio screen: Daily reports, with numbered red boxes marking the steps
Screens from Yumio's demo company, Modern Build Contracting. Its projects, people and figures are sample data.Open the picture full size

Step by step

  1. 1Choose the project and the Date of the report.
  2. 2Press Generate report. If nothing was confirmed that day, you see Confirm at least one site update for this day first. with a link to the updates still waiting.
  3. 3Use Drafts to see the reports not issued yet, and press a report to open it.
  4. 4In the report, check the Summary, Work done, Manpower and Risks and issues. If new updates were confirmed after it was drafted, press Update now.
  5. 5Press Issue report. The confirm box lists the open points before you issue.
  6. 6Press Download PDF or Print / PDF, or Post to Telegram group to share the issued report with the project group.

What you see on the screen

  1. 7Reports, Issued, Drafts and Last 7 days count the reports in the list. Drafts marked to issue still need the owner or a project manager.
  2. 8A draft card turns yellow after 2 days and red after 5, and says how old it is. The number on the card (#) is the report number.

More in this section: Site