Snags

The Snags tab is the project's punch list (SN-001…). The site team and the office raise snags; whoever fixes one reports it with an "after" photo; the engineer checks it and closes it or sends it back.

Yumio screen: Snags, with numbered red boxes marking the steps
Screens from Yumio's demo company, Modern Build Contracting. Its projects, people and figures are sample data.Open the picture full size

Step by step

  1. 1Press Add a snag. Fill in Where, What is wrong, photos, Who fixes it, Fix by, Priority and the BOQ line, then press Save snag.
  2. 2Use the filters: To fix, Overdue, To check, From site, Closed and All. Each shows how many snags it holds.
  3. 3Narrow the list by who fixes it, or search a place or a word.
  4. 4Whoever fixes a snag presses Mark fixed, adds an after photo, and presses Send for checking.
  5. 5The engineer then presses Accept and close, or Not fixed with a note on what is still wrong.
  6. 6Press Print sheet to print the list as it is filtered.

What you see on the screen

  1. 7A snag's badge shows its state: To fix, Due soon (two days or less to its date), Overdue, then fixed and closed. A red count shows how many times a fix was sent back.
  2. 8Before and After show the photos of the defect and of the fix.